Checklist: Migrating to a Data Center

In This Article

Preparing for Migration to a Data Center

Migrating to a data center can be a complex process, but having a comprehensive checklist can help ensure a smooth transition. Key considerations for a data center migration checklist include assessing the current IT infrastructure, selecting the right data center provider, planning the migration process, and testing and verifying the migrated systems. Additionally, it’s important to ensure that all relevant stakeholders are informed and involved throughout the migration process.

By following a thorough checklist outlined below, organizations can minimize downtime, reduce the risk of data loss, and ensure a successful data center migration.

Migration Checklist

1. Infrastructure Assessment

First, take stock of all servers, storage devices, and network equipment to ensure a comprehensive understanding of your infrastructure. 

  • Inventory all servers, storage devices, and network equipment.  
  • Identify dependencies between applications, databases, and services.  
  • Determine power and cooling requirements for the hardware.  
  • Assess physical space and rack unit needs. 

2. Time & Scheduling

Develop a detailed timeline and schedule with your new data center host to understand specific requirements for equipment, power, and network connections and ensure all dependencies are handled and minimize downtime.

  • A site survey of the new data center should be conducted to verify compatibility with the company’s infrastructure, ensuring power, cooling, and space needs are met. 

3. Server Preparation

Prepare your servers for the migration by thoroughly documenting and labeling the hardware and cabling. Perform health checks on each server to identify any potential issues.

  • Label and document hardware and cabling.  
  • Verify server health (e.g., check for disk failures, CPU/memory stress tests). 
  • Update firmware, OS, and applications before migration. 
  • Decommission or virtualize legacy hardware if necessary. 

4. Backup & Disaster Recovery

Before migrating your data, perform a complete backup to ensure that you can recover in case of an issue. Test your data restoration process to verify that it’s working correctly and that your data is intact. 

  • Perform full backups before migration.  
  • Test data restoration and verify integrity. 
  • Update disaster recovery (DR) and business continuity plans. 
  • Set up offsite or cloud-based backups for redundancy.  

5. Moving Equipment

Physically transporting equipment, which is critical for a colocation migration, requires careful planning and coordination with your data center staff.

  • Select a reputable moving company with data center experience; your data center provider should be able to recommend a reliable moving company that they’ve worked with. 
  • Scheduling and coordinating with your data center to ensure safe handling and delivery is essential to prevent any damage and downtime.  

6. Network Configuration

Develop a solid network configuration plan by defining IP addressing, VLANs, and subnet settings. Verify that WAN and LAN connections between your office and data center are stable and functioning correctly.

  • Plan IP addressing, VLANs, and subnet configurations. 
  • Confirm WAN/LAN connectivity between the office and data center.  
  • Configure and test VPNs, firewalls, and security policies.  
  • Ensure redundancy and failover mechanisms are in place. 

7. Security & Compliance

Ensure the security of your data and systems by verifying that remote management access is encrypted and securely controlled.

  • Verify encryption and secure access controls for remote management. 
  • Review firewall rules and intrusion detection/prevention settings.  
  • Implement logging and monitoring for security events.  
  • Ensure compliance with relevant regulations (e.g., GDPR, HIPAA, SOC 2).  

8. Application & Service Migration

To ensure all necessary applications and services are compatible with the new server environment. Test the migration process with non-critical applications first to identify any potential issues.

  • Identify critical applications that need minimal downtime.  
  • Plan for phased or staged migrations to reduce impact. 
  • Test applications in a sandbox environment before the final move. 
  • Validate database consistency and performance post-migration. 

9. Testing & Validation

While communicating downtime and setting up user access permissions are important steps in the migration process, it is also crucial to thoroughly test and validate the migration to ensure that data is transferred accurately and without errors.

  • Conduct network connectivity and latency tests.  
  • Verify server performance and application responsiveness.  
  • Test failover mechanisms and high availability configurations.
  • Monitor system logs for errors or unexpected behavior. 

10. Training & Communication

A Communication with end users and stakeholders is crucial for a smooth transition. Training should cover new security protocols, access methods, and maintenance procedures specific to the data center environment.

  • Provide training for IT staff on how to operate and maintain the new server environment. 
  • Set up user access – permissions and security settings in the new server environment to ensure data protection and compliance. 
  • Communicate with end-users about changes to access or functionality as a result of the migration. 
  • Offer support and resources for users to adjust to the new system smoothly. 
  • Ensure all stakeholders are informed about the migration process and its potential impact on business operations. 
  • Update any internal documentation and IT protocols. 
  • Monitor and validate post-migration access for any issues. 

11. Contingency Plan

This plan should outline steps to address any unforeseen issues that may arise, such as data loss or system failures, to minimize downtime and ensure business continuity. 

  • Have a rollback plan in case of migration failure.  
  • Ensure temporary office infrastructure is available if needed. 
  • Assign dedicated personnel to handle issues during cutover. 

12. Post-Migration Review

Scheduling a post-migration review to identify areas for improvement and document any processes that didn’t work well is important for future migrations.

Following these steps and building a contingency plan will help your business reduce migration risks and ensure a seamless transfer. Clear communication channels are also important to keep stakeholders aware of developments and challenges. Reviewing the migration procedure afterward will help improve it for future projects. A successful move that avoids disruptions and improves operational efficiency requires considerable planning and preparation. 

Tour ifonica’s Canadian data center

We’d love to learn more about your company and show you how we can help manage the safety and integrity of your data, book a tour of our data center in Markham, Ontario. 

If you’re interested in learning more about ifonica’s data center solutions, get in touch with one of our data center experts.

Read more informative articles from ifonica.

Get the latest news and updates